CPK, FAI and PPAP: What Buyers Should Ask a Machining Supplier

If you are sourcing precision-machined components for liquid cooling systems, you will encounter three acronyms: CPK, FAI, and PPAP.

Understanding these terms helps you evaluate suppliers and ensure consistent quality.

CPK: Process Capability Index

CPK measures how consistently a manufacturing process produces parts within tolerance.

What It Tells You

 
 
CPK ValueMeaning
<1.00Process is not capable
1.00–1.32Process is acceptable
≥1.33Process is capable and stable

A CPK of 1.33 means approximately 1 in 1,500 parts may fall outside tolerance. For critical liquid cooling components, this is the industry standard.

What to Ask

  • "What is your CPK on critical dimensions?"

  • "Do you monitor CPK during production runs?"

FAI: First Article Inspection

FAI is a full dimensional inspection performed on the first part from each production run. It verifies that the manufacturing process produces parts that meet all drawing requirements.

What It Includes

  • Full dimensional measurement

  • Material verification

  • Surface finish inspection

  • Documentation of all results

What to Ask

  • "Do you provide FAI reports?"

  • "How many parts do you inspect for FAI?"

PPAP: Production Part Approval Process

PPAP is a standardized documentation package used in automotive and high-reliability industries. It provides evidence that a supplier can produce parts that meet all requirements consistently.

What It Typically Includes

  • Design documentation

  • Process flow

  • FAI results

  • CPK data

  • Material certifications

  • Test results

What to Ask

  • "Do you offer PPAP-level documentation?"

  • "What is your standard inspection package?"

Quick Comparison

 
 
AspectCPKFAIPPAP
What it measuresProcess stabilityFirst part complianceFull process capability
When usedThroughout productionStart of productionDuring qualification
OutputStatistical valueInspection reportFull documentation package
Industry standard≥1.33Per drawingVaries

What to Ask Your Supplier

For liquid cooling components, ask these four questions:

1. "Do you provide FAI reports with first shipments?"

FAI confirms the first parts meet your drawing. Always request it.

2. "What is your CPK on critical dimensions?"

The answer should be 1.33 or higher.

3. "Do you provide material certifications?"

Confirm material grade, sulfur content, and heat lot traceability.

4. "Can you provide PPAP-level documentation if required?"

Some applications require full traceability and process documentation.

Final Thought

CPK, FAI, and PPAP are not just paperwork. They are evidence that your supplier can deliver consistent quality.

If a supplier cannot provide CPK data or FAI reports, consider that a red flag.

Need CPK-controlled components for your cooling system? Send your drawing for a quote.